The brief
A family wanted a two-storey villa with a pool on soft riverside ground, so foundation loads had to stay low.
Our solution
A light-gauge steel frame cutting loads by about 70% compared with concrete, a steel deck slab and light insulated walls.
Result
Handed over after 45 days; the family moved in before Tet.






