The brief
A manufacturer needed a 1,500 m² column-free factory for its production line, ready for a new order within the quarter.
Our solution
A 30 m clear-span pre-engineered steel frame, insulated metal roof, and space reserved for two more bays.
Result
Completed in 2 months; production started on schedule.