Turnkey prefabricated and steel-frame homes
Get a quote
KNOWLEDGE · 18.10.2026 · 1 MIN READ

5 steps from idea to handover

Thành Nhân House — Plan
IN THIS ARTICLE

Knowing the process helps owners prepare the right documents and budget for each stage.

1. Survey and advice

We measure the site and discuss your functional needs and budget.

2. Design and quotation

We finalise the architecture, structure and a detailed estimate.

3. Component manufacturing

Components are roll-formed, punched and numbered in the workshop while the foundation is built.

4. Erection

Frame, envelope and finishes are completed as agreed.

5. Handover and warranty

Final inspection, as-built documents and maintenance guidance.

Related articles